Main Goal: The Red River Road Culvert Replacement project was initiated to address the urgent need for infrastructure repair after the old culvert washed out on a major thoroughfare in Thunder Bay, Ontario. The primary objective was to ensure the safety and reliability of this critical roadway.
Key Features:
Removal of the Old Culvert: The first phase involved the careful removal of the old, damaged culvert, which had become a significant hazard.
Construction of a New Culvert: A new, robust culvert was built to replace the old one, designed to withstand future weather events and heavy traffic.
Road Reconstruction: Following the installation of the new culvert, the road was reconstructed on top, restoring the thoroughfare to full functionality and improving its durability.